276
you are viewing a single comment's thread
view the rest of the comments
view the rest of the comments
this post was submitted on 25 May 2024
276 points (100.0% liked)
Technology
59598 readers
2837 users here now
This is a most excellent place for technology news and articles.
Our Rules
- Follow the lemmy.world rules.
- Only tech related content.
- Be excellent to each another!
- Mod approved content bots can post up to 10 articles per day.
- Threads asking for personal tech support may be deleted.
- Politics threads may be removed.
- No memes allowed as posts, OK to post as comments.
- Only approved bots from the list below, to ask if your bot can be added please contact us.
- Check for duplicates before posting, duplicates may be removed
Approved Bots
founded 1 year ago
MODERATORS
Yeah, non-USA for this atm, as much fun as it would be to plug such a system into an apartment.
I believe that the US requires that a direct-feed system has to plug into a physical kill switch setup to prevent back-feed of power during an outage.
Still pretty neat, though!
Same for the EU.
Solar inverters also need to follow the grid frequency
They don't follow the grid frequency because the EU or US regulations require it, they follow the grid frequency because physics demands it.
In this house we obey Ohm's law!
Interesting - which other generators for example wouldn't you want starting up?
I think I get that, thanks. So an Island grid is less stable and could cause itself damage if two microinverters say are trying to sync up to each other vs a beefy, stable main grid?
So how does a backup battery system work when islanded? Typically also at 52Hz?
Or can it go into a 60Hz beefy mode?
It would be nice to get all the little island solar inverters working when the grid goes down!
I'm guessing the commenter above is in the EU and operating at 50Hz normally, so running at 60Hz wouldn't be a great idea. A backup battery and such operate in the same way when islanding.
IIRC some inverters are able to sync up with alternative power sources, but the documentation is extremely limited and seems to be reserved mostly for large-scale systems. I know my Solaredge system has slowly been implementing using both at the same time, but the documentation is pretty unclear as to how this works. I know at the very least it'll allow you to use a 2-wire start to kick a standalone generator on when the batteries are low, but don't know much else about how it's currently set up
Also in the US regular 120v outlets are fed from 1 of 2 transformer legs. If you back fed power through a 120v outlet, roughly half of the circuits in your home would function and the others would be dead.
And disclaimer: no one should do this, but when the transfer switch disconnects from the grid, would it work to jump say a breaker across the L1-L2 hots to share that 120v backfeed over both?
Clearly the 240v appliances won't work in this configuration, but the fridge on one leg and the internet on the other will still work ok, right?
Again, no one try this - it's just a thought exercise.
Yes, it will actually work. I know it's very much not to code, but when we lost power for over 10 days, I did this to keep our furnace running and us from freezing to death since it was -10F out.
I only have a small 120V generator, but hooked both legs to hot and backfed via our EV charger's outlet, since its a 50A circuit. Like you said, nothing 240V worked, but that little 3kW generator did a great job powering basically the whole house with no issues.
That winter was definitely a big driver for me to get a backup battery system so our solar could power the house.
No.
According to the article this system also detects power outages and shuts off when they happen. Just like full-scale solar power systems. But yeah, no physical kill switch.
These systems automatically turn themselves off during an outage.
That's great, but it doesn't matter unless it has the physical cutoff that's required to bring that kind of system up to the current electrical code for such a system.
they have relays (well, most of them. looking at you, Deye), so it should be fine
Physical shutoff via relays is required by the standard. We've just been through a scandal where a manufacturer skimped out on putting them in and had to recall the devices.