[-] markstos@lemmy.world 37 points 1 year ago

It’s marking the joint between two track segments. Look just above it. On both tracks there’s a series of bolts indicating that two track segments have been bolted together.

Not sure why the other joints aren’t marked.

[-] perviouslyiner@lemmy.world 12 points 1 year ago* (last edited 1 year ago)

if that was an insulated joint for track circuit separation there would be cables attached at each side and the two bolted plates would be aligned?

[-] Darkassassin07@lemmy.ca 12 points 1 year ago

You can see 3-4 wires connected on either side of the plates.

I'm not sure if those particular plates are insulating connections though. Doesn't really look like it, but I'm no expert on rail connections.

[-] perviouslyiner@lemmy.world 4 points 1 year ago* (last edited 1 year ago)

good spot, those wires are smaller than I am used to seeing - so it is a track circuit boundary as well as whatever the pink means.

[-] chaogomu@kbin.social 11 points 1 year ago

Rail is most often welded together, not joined like this.

So you likely don't need more than one marking.

this post was submitted on 30 Jan 2024
112 points (100.0% liked)

What is this thing?

6120 readers
20 users here now

Let us help you identify that mysterious object you’ve found.

Currently in CHALLENGE mode: If you've got something obscure knocking about, post a picture, and let's see how we do. Please prefix such posts with "CHALLENGE:" so we know we've got a fighting chance.

founded 2 years ago
MODERATORS