824
you are viewing a single comment's thread
view the rest of the comments
view the rest of the comments
this post was submitted on 17 Aug 2026
824 points (100.0% liked)
Technology
87280 readers
2944 users here now
This is a most excellent place for technology news and articles.
Our Rules
- Follow the lemmy.world rules.
- Only tech related news or articles.
- Be excellent to each other!
- Mod approved content bots can post up to 10 articles per day.
- Threads asking for personal tech support may be deleted.
- Politics threads may be removed.
- No memes allowed as posts, OK to post as comments.
- Only approved bots from the list below, this includes using AI responses and summaries. To ask if your bot can be added please contact a mod.
- Check for duplicates before posting, duplicates may be removed
- Accounts 7 days and younger will have their posts automatically removed.
Approved Bots
founded 3 years ago
MODERATORS
Man I want your supplier for batteries and panels tbh.
A single DGX B300 that could run Kimi for a few concurrent users, uses 14 kW. Costs about 500k. Assuming you live far enough from the equator to have seasons, you'll have about 8 hours of daytime at the worst points of the year (less at my latitude for an example, we get ~6 hour days in the dead of winter, with sun angles below 10 degrees and sunshine available... not every week)
Even in a slightly less extreme location, You'd be looking at roughly a 100 kW array to fill the battery and power that one server reliably like when there's clouds, about 300 kWh battery capacity to get through long nights. Easily 6 figures total cost, maybe 20-40% of the server itself. This assumes no electricity used for cooling, so it's very much back of the envelope math, reality could be much worse or a tiny bit better depending on your latitude.
Huh? 1400 TDP = 1.4 kW. This is official I believe.
And maybe my sources are off but: "As of July 2026, a single B300 GPU purchased outright runs about $53,000 (Spheron Network, July 5, 2026)" https://tech-insider.org/nvidia-blackwell-gpu-pricing/
Uh you're right, you need about 4x so 270 kWh over the day, which requires about 270 / 6 * 24 = ~1000kW. With about 175€/kWp panels that is another 175 thousand plus installation. And something like 4000m². But that is all the energy costs for 30 years up front. The bigger constraint is the land use then.