1079
ISO 8601
(slrpnk.net)
Comic Strips is a community for those who love comic stories.
The rules are simple:
Web of links
Hey, I quite like this! You're the first person I've found that's thought of fixing the calendar by adopting six-day weeks. I have a very similar personal version, with two main differences:
I also came to the same conclusion about workweeks. With two-day weekends, the Gregorian calendar has 71 % of workdays but the new calendar only has 67 %. On a thirty-day month this means 20 workdays instead of 21,5. Having the six-day week could also theoretically allow for a move to three- or two-day weeks in a post-scarcity future and doing away with weekends, as well has having either 50 % or 67 % of the workforce being active every day of the week, and not the wild levels of fluctuation seen today. Not having 100 % commuting some days of the week and a fraction of that on others would allow to scale things like transport infrastructure much more effectively
How does that work, with the leap week? Doesn't the year drift out of alignment with the solar cycle?
Only in eight year chunks. By year seven there is more unalignment than there was in year one, but it goes back to normal on year eight. Same thing as with leap days, just a slightly bigger scale.
In fact, with current rules, the shift in the regular Gregorian calendar becomes quite big when considering 100-year and 400-year cycles. In theory, a leap week calendar with new and updated rules could have a very comparable if not a smaller average deviation from the true solar date, though I haven't ran the precise calculations
Ok, so, first, let me say that while I'm enthusiastic about the concept, I understand it's entirely theoretical. We can't even get US civilians to adopt metric, FFS. Just a caveat, lest anyone wander by and overhear us.
That said, I did spend some cycles trying to see it it would be possibly to line up a lunar and solar calendar, and it's not. And it isn't nearly as important as it used to be. It would still have been nice.
So if you do run calculations, I'd like to see them.