Munich (Stachus) ❤️
How does this work with overhead power lines?
Child's play compared to the old "tram squares" in Melbourne where a 600VDC tram crosses a 1500VDC train line:
Related:
Learning From Melbourne’s Level Crossing Removal Project - RMTransit | https://www.youtube.com/watch?v=5T_auX_R4dw
Yeah! Two of the four remaining ones have been removed as part of the project. It's kind of silly though, the other two aren't currently slated to be removed.
Just fine.
The overhead line is the equivalent to a third rail, while the rails provide the earth connection.
So it can just be a continuous diamond shape above, same as the rails below.
they usually use metal plates under and touching the wires to make a seamless transition
That must be difficult to maintain. Won't it need specially made rails?
These are fairly common on railroads so they can't be too bad on maintenance
Factorio flashbacks!
Trams, Trolleys and Streetcars
A Community for the interessting world of Trams, Trolleys and Streetcars!